Hours: Mon-Fri: 9am – 4pm
Get Directions
Archives: Project
Nerada Solar Power System Install – Tindo Solar Panels
13.2kW Solar System installed in Nerada, Far North Queensland using 42 x 315W Australian Made Tindo panels and a Fronius Symo 15kW inverter.
Read More
Malanda Post Office – Commercial Solar Installation
6.6kW Solar System installed for Malanda Post Office using 20 x 330W Seraphim Half Blade panels and Fronius Primo 5kW inverter.
Read More
Kurrimine Beach Solar Power Installation – SolarEdge
6.6kW SolarEdge System installed in Kurrimine Beach using 22 x 300W SolarEdge panels and SolarEdge HD Wave inverter.
Read More
NQ Truck Bake – Townsville Solar Install
36kW Solar System and a 25kW Solar System installed for NQ Truck Bake in Townsville. The system included a total of 200 x 300W Seraphim Monocrystalline panels and a 3 x Fronius Symo inverters.
Read More
Mount Sheridan Battery Storage Installation
7.8kW SolarEdge System installed in Mount Sheridan. This system includes 19.6kWh of Battery Storage.
Read More
Port Douglas Solar Panel Install – SolarEdge
19.5kW SolarEdge solar panel System installed in Port Douglas. The solar power system includes 63 x 310W SolarEdge solar panels and 3 x SolarEdge HD Wave solar inverters.
Read More
Trinity Beach 19.8kW Solar Power Setup – Sungrow 15kW Inverter
19.8kW Solar System installed in Trinity Beach for a young family. The system includes 60 x 330W Seraphim Half Blade panels and a Sungrow 15kW inverter.
Read More